blank drop down
drop down
About
|
Portfolio
|
Contact
|
Home
STUDIOANT
Professional Work
* Click a photo to begin
Professional Experience
The following projects are a sample of my professional work experience. Some of the projects were completed while working at an architecture firm while others are freelance jobs I have picked up along the way. For a complete list of my project experience please click here.
Arrow
Arrow
Professional Work Pages
St Bernards
2nd Floor Fitness Rendering
Pool Rendering
Lobby Rendering
Locker Room Rendering
Treatment Room Ceiling Detail
First Floor Plan
Second floor plan.jpg
RCP.jpg
Interior Elevations.jpg
Millwork Details.jpg
St. Bernard's Health & Wellness Institute
Role: Job Captain, Construction Administration, & 3D RendererFirm: OLC ArchitectureProject Location: Jonesboro, ARProject Size: 55,000 sq. ft.Project Cost: $11.5 million (estimated)Project Completed: August 2011 (estimated)Client: St. Bernard's Medical Center 1413 E. Matthews Avenue Jonesboro, ARDescription: St. Bernard's Health & Wellness Institute is a progressive medical wellness center that combines the traditional medical center doctor's suites with a state of the art fitness center to support physical therapy, fitness, wellness education with all of the amenities of a private fitness club.
Rock Springs
Exterior at Dusk
Indoor Slide Pool
Splash Pad Geyser
Site Plans
Indoor Lazy River
Outdoor Pool Building
Rock Springs Aquatic Addition
Role: Job Captain, Construction AdministrationFirm: OLC ArchitectureProject Location: Rock Springs,, WYProject Size: 12,000 sq. ft.Project Cost: $7 million Project Completed: 2010Client: City of Rock Springs Parks & Recreation DepartmentDescription: Phase 1: A community splash pad with a large water geyser that overflows into a shallow river lined with several spray features. Also part of phase 1 is the indoor aquatic expansion with leisure pool, dual water slides with a splash zone, large current channel, and play structure, as well as the addition of party rooms and family changing area. A unique sunken patio will complete the aquatic addition by connecting to the phase two outdoor pool addition.Phase 2: Adjacent to the expansion will be an outdoor pool and pool house which features a leisure pool with another zero-depth entry and a play structure, spray arches and geysers, and a 4-lane, 25-yard lap pool, new pool house locker rooms, concessions and several picnic pavilions.
Newtown AC
Site Plan
1st Floor Plan
2nd + 3rd Floor Plans
Salon Floor Plan - Renovatoin
Salon Millwork Sections
Yoga Room Remodel
Newtown Athletic Club
Role: Job Captain, Revit Support Staff & DesignFirm: OLC ArchitectureProject Location: Newtown, PAProject Size: 275,000 sq. ft. (after all additions)Project Cost: $2.5 million Interior Renovation (estimated), $12 million additionProject Completed: Various Dates, Final estimated to be May 2013Client: Newtown Athletic Club Newtown, PADescription: This is an on going phased building renovation and addition. Renovation areas include the Salon/Spa, Kids' Area, Cafe, Lobby, Yoga Room. The addition is an open fitness area, a separate field house & baseball training facility, outdoor pools and pool house.
YMCA Chicago
Women's Colored Floor Plan
Men's Colored Floor Plan
Women's Lkr Rm Elevation
Men's Lkr Rm Elevation
Southside Chicago YMCA
Role: Main Support Staff & RendererFirm: OLC ArchitectureProject Location: Chicago, ILProject Size: 6,600 sq. ft. Project Cost: $580,000 (estimated) Project Completed: still in designClient: YMCA of Metropolitan Chicago 801 N. Dearborn Chicago, IL 60610Description: Full remodel and upgrade of the men's and women's locker rooms.
Castle Rock
319 Jerry Apt
Building 01
Building 04
Building 05
CR Insurance Columbine
302 CR Bar and Grille
Wilcox Square Design Competition
Role: Presentation MaterialsAward: 1st PlaceFirm: OLC ArchitectureProject Location: Castle Rock, COProject Size: n/a Project Cost: n/a Project Completed: 2011Client: Castle Rock Downtown Development Authority, Facade ProgramDescription: The Downtown Development Authority (DDA) set up a design competition to revitalize the historic district in downtown Castle Rock. The competition included complete redesigns of exterior facades of each building on the square. Owners would receive matching grants if they chose to renovate their building facades. To view the DDA website click here.
Arrow
380 Forest
Orig. Uncovered Patio
Proposed Patio Cover Addition
Floor Plan
Section
Column Detail
Hilltop Patio Addition
Firm: Freelance Design WorkProject Location: Denver, COProject Size: 175 sf. Project Cost: $5,000 (estimate)Project Completed: 2011 (estimate)Client: Home OwnerDescription: Design a patio structure to shield the patio from the elements and protect the home from water penetration caused by the original poorly designed patio slab.
Russian Dance Studio
Dance Studio Floor Plan
Dance Studio RCP
Dance Studio Rendering
Dance Studio Elevation
Dance Studio Material Board
Locker Room Floor Plan
Locker Room Finish Plan
Locker Room Tile Patterns
Locker Room Material Board
Russian Dance Studio
Role: Designer, Interior DesignerFirm: Freelance Design WorkProject Location: Moscow, RussiaProject Size: 794 sq. meters (8,545 sf.)Project Cost: n/aProject Completed: 2010Client: Russian Fitness GroupDescription: I was hired to design a major interior finish upgrade for the locker rooms and dance studio as well as pay special attention to sound control in the dance studios.
San Ant Club
Basement Floor Plan
First Floor Plan
Second Floor Plan
San Antonio Fitness Club
Role: DesignerFirm: Freelance DesignProject Location: San Antonio, TXProject Size: 20,000 sfProject Cost: n/aProject Design Completed: 2004Client: --?Description: Phase one for this job required a conceptual layout for a high end fitness club. The fitness club covers approximately 20,000 square feet of a renovated historical building in downtown San Antonio. The spaces created here allow for minimal impact on the existing open spaces of the building. These layouts allow for a speedy workout for professionals on the go, as well as longer workouts for those wanting to spend time at the club. Phase two will allow each plan to go into further detail of each space of the gym as well as perspective details noting three dimensional characteristics of the space.
Kingwood
Lap Pool and Building at Dusk
Splash Pad
First Floor Plan
Site Plan
Front of Building
Fitness Floor
Back Covered Patio
Front Desk
Massage Room
Overview of Pools
Sections
Cafe
Kingwood Fitness & Sports Center
Role: Main Support StaffFirm: OLC ArchitectureProject Location: San Antonio, TXProject Size: 17,600 sfProject Cost: $6 millionProject Completed: 2008Client: Kingwood Fitness & Sports Center 1700 Lake Kingwood Trail Kingwood, TX 77339Description: The new addition features state-of-the-art cardio and circuit / strength training equipment, group exercise studio, full-service day spa, locker rooms, café, pro shop, childcare, F & B / concessions, and administrative offices. New aquatic amenities include a lazy river with numerous water spray features, kiddie slide, splash pad featuring a variety of water spray toys, dumping bucket water play structure, sprays and geysers.
Calhan
Entry
Overview
Outdoor Lap Pool
Overview 2
Site Plan
Floor Plan
Eastern Plains Family Aquatic Center
Role: Presentation MaterialsFirm: OLC ArchitectureProject Location: Calhan, COProject Size: 2,800 sf + Outdoor PoolsProject Cost: N/AProject Design Completed: 2010Client: Calhan, CODescription: These presentation materials were put together for project fund raising.
Dream Gardens
cover.jpg
Vision Page
Complex Description
Gardens Description
Gardens Description 2
Gardens Description 3
Gardens Description 4
Cultural Center
Bonsai Store
Tea House
Cottages
Wedding Garden
Asian Restaurant 1
Asian Restaurant 2
Executive Suites
Spa 1
Spa 2
Design Team
Dream Gardens
Role: Designer & Graphic DesignFirm: Freelance DesignProject Location: Coppell, TXProject Size: 20 acresProject Cost: N/AProject Design Completed: 2004-2005Client: The Leone Group Coppell, TXDescription: Master plan and strategic planning to raise funds for this complex.Project Description: Dream Gardens will be built on the theme of harmonizing mind, body and soul with the pervasive organic environment around them, bringing good health, joy and peace to our guests. Memorable relationships will be formed with each customer through the integration of people and cross-cultural traditions, services and products. Dream Gardens believes in the promotion of health and beauty of body and soul conjointly with a harmonious relationship with nature. Nature will be explored with an understanding of cross-cultural traditions and lifestyles of both Western and Eastern origin. Gardens and landscapes will meld into every crevasse, filling the atmosphere with breathtaking views and peace of mind. This atmosphere will enrich the visual literacy of the community through art, performance, education and the environments within and beyond. The complex will be established to educate, entertain, enliven, and entice inquiry of our patrons perception of Eastern influence on the modernized Western world of art, architecture and environment. The experience hopes to encourage artists, societies, philosophers, actors, children, and adults alike to partake in the perpetual and boundless opportunities available at these establishments and extraordinary environments.
Morgan Run
Floor Plan
Front Entry
Fitness Floor
Kids' Area
Exterior at Golf Course
Outdoor Pool
Locker Room
Locker Room Lounge
Locker Room Vanities
Outdoor Pool
Morgan Run Resort & Club
Role: Main Support StaffFirm: OLC ArchitectureProject Location: Rancho Santa Fe, CAProject Size: 15,000 sfProject Cost: $6.2 millionProject Completed: 2008Client: Morgan Run Resort & Club 5690 Cancha de Golf Rancho Santa Fe, CA 92091Project Description: With fantastic views overlooking the clubs golf courses, the new addition features state-of-the-art cardio and circuit / strength training equipment, group exercise studio, full-service day spa, golf locker rooms, café, and childcare. New aquatic amenities include an outdoor leisure pool with zero-depth entry, kiddie slide, 2-lane 25-yard lap pool, whirlpool, and splash pad featuring numerous water spray toys, dumping bucket water play structure, sprays and geysers, food concessions, and changing rooms.
Coto de Caza
First Floor Plan
Second Floor Plan
Front Entry
Tennis Court
Fitness Floor
Locker Room
Weight Room
Group Exercise Room
Main Stair
Fitness Floor
Lobby
Pro Shop
Cafe Seating
Main Staircase
Spa & Sports Club at Coto de Caza
Role: Main Support StaffFirm: OLC ArchitectureProject Location: Coto de Caza, CAProject Size: 12,000 sfProject Cost: $5 millionProject Completed: 2008Client: Coto de Caza Golf & Racquet Club 25291 Vista del Verde Coto de Caza, CA 92679Project Description: A 2-level fitness addition to the existing clubhouse featuring state-of-the-art cardio and circuit / strength training equipment, group exercise studio, mind/body studio, full-service day spa, locker rooms, family changing rooms, café, pro shop, and childcare.
YACC
Floor Plan
Front Enrty
Activity Room
Activity Room
Game Room
Front Entry
Front Entry
Game Room
Activity Room Ceiling
Lobby Ceiling
Youth Activity & Community Center
Role: Construction Administration & Main Support StaffFirm: OLC ArchitectureProject Location: Cheyenne, WYProject Size: 11,000 sfProject Cost: $2.1 millionProject Completed: 2009Client: City of Cheyenne, WYProject Description: This newly renovated community center features a multi-use sport court, climbing wall, a fitness area, game room, computer lab, social gathering space, snack area, community meeting / conference rooms, staff offices, restroom expansion and maintenance storage areas. These new amenities not only update an older facility but turn it into a recreation destination for the whole community to enjoy. During construction contaminated soils under an existing slab were found, which created a unique design dilemma. The creative, cost conscious solution was to build up a raised, aerated slab to air out any contaminates.
Wind Turbine
air dolphin
air dolphin
air dolphin
Building Elevation
SITE PLAN
Permit Document
Denver Roof Wind Turbine
Role: Job Captain & PermitingFirm: OLC ArchitectureProject Location: Denver, COProject Size: N/AProject Cost: N/AProject Completed: 2011 (estimate)Client: OLC ArchitectureProject Description: American Zephyr Corp. graciously donated one of their amazing micro wind turbines to OLC Architecture's Corporate Headquarters. This location will be their first installation in the United States and Denver's second roof wind turbine within the city limits.
complete list of projects
Project Experience Overview
• St. Bernards Health & Wellness Institute - Job Captain/ Construction AdministrationMedical wellness center, Jonesboro, AK, 55,000sf, $11.5 million (est.), 2011• Rock Springs Recreation Center - Job Captain/ Construction AdministrationIndoor aquatic facility expansion, Rock Springs, WY, 12,000sf, $7 million, 2010• Newtown Athletic Club Kids, Yoga, Salon, Spa, F&B, Fitness Addition - Job Captain & DesignInterior renovation, remodel & expansion, Newtown, PA, Various budgets, 2010-11• Minot State University Student Wellness Center - Support StaffFitness expansion & renovation, Minot, ND, 65,000sf, $10 million (est.), 2011 (est.)• Campbell County Recreation Center - Support StaffRecreation center and indoor competitive track, Gillette, WY, 189,000sf, $52 million, 2010• Half Acre Gymnasium Expansion and Renovation, Univ. of Wyoming -Graphics & Support Expansion & remodel, Laramie, WY, 141,000sf, $33 million (budget), design only - 2010• Youth Activity and Community Center - Construction AdministrationCheyenne, WY, 11,000sf, $2.1 million, 2009• Sweetwater County Child Development Center Support StaffSpecial education school, Green River, WY, 38,025sf, $10 million (est), Design only -2010• Kingwood Fitness & Sports Center - Job CaptainSan Antonio, TX, 17,600sf, $6 million, 2008• Morgan Run Resort & Club - Job CaptainNew country club fitness facility, Rancho Santa Fe, CA, 15,000sf, $6.2 million, 2008• Spa & Sports Club at Coto de Caza - Job CaptainCountry club fitness facility major addition, Coto de Caza, CA,12,000sf, $5 million, 2008• Cherry Creek Athletic Club - Job Captain Fitness club renovations, remodels & addition, Glendale, CO, 2007-2009• Fair Oaks Fitness Center - Job CaptainNew country club fitness facility, Fair Oaks, TX, 17,00sf, $5 estimate• Country Club at Hilton HeadFitness club addition & renovation, Hilton Head, SC, 5,000sf, $1.5 million, 2007• Stone Creek Athletic Club & SpaCovington, LA , 55,000sf, $16 million, 2009• Mission Hills Spa & Sports CenterCountry club addition, Rancho Mirage, CA, 10,000sf, 8,000 SF remodel,$2.6 million, 2006
Projects on the Boards
• AIA Denver Habitat for Humanity of Colorado Design-Build Competition• Castle Rock private residence spa & fitness wing• Spectrum Club Locker Room Remodel• Newtown Athletic Club Baseball Training Facility
Arrow
Arrow
copyright 2011
2nd Floor Fitness Low Res.jpg
20101020_hog_wy_aquatics21.jpg
DSCN1057.JPG
Office Building Rendering.jpg
Pool Rendering Low Res.jpg
atharrett boards_Page_1.jpg
Locker Room Aerial-low res.jpg
presentation_slides_Page_5.jpg
Home
Academic Work
Contact
About
Portfolio
Graphic Design
Other Design Work